King Open School – Cambridge, MA
Provided handicapped accessibility and new elevator. Accessibility survey provided phased in ADA/MAAB plan for the 116,810 sq. foot school. New three stop exterior elevator located in courtyard.
Provided handicapped accessibility and new elevator. Accessibility survey provided phased in ADA/MAAB plan for the 116,810 sq. foot school. New three stop exterior elevator located in courtyard.
Accessibility This project saw the updating and renovation of mechanical, heating, and ventilation systems; electrical systems, including lighting, power, and fire alarms; and a new interior 5 stop hydraulic elevator.
Green Design The Essex Aggie Mechanics Building suffered from high water table leading to basement floor moisture and elevator pit flooding making the elevator and controls inoperable and subject to high vapor conditions. New de-watering plan was developed from three …
Green Design Three new energy efficient replacement boilers were installed at Westford Academy and Nabnasset Elementary Schools. Supporting calculations determined highest energy use and heat gain/loss, and were used to design and balance efficiency for the 2.5 MBH and 4.6 …
Westford Academy & Nabnasset Elementary – Westford, MA Read more »
Systems Upgrades Burke Elementary School is being provided with with A/E services to provide a new roof and solar roof panels. In addition, the school will receive a new boiler. This project is being done under the MSBA Green Repair …
Additions/Renovations Design, construction documents and construction administration were provided for a Historic Preservation / Interior Renovation project. Additionally a new elevator and various other handicapped accessibility improvements were provided for Essex Agricultural Technical High School.
New Construction Completed enclosed addition as well as HVAC improvements to the existing cafeteria at the Robinson School for the Westford Public School Department. Produced an addition of three classrooms by using space that was formerly utilized as an exterior …
Roof/Window Replacement The existing roofing system and deteriorated components were investigated. A new shingle and flat membrane roofing system was designed to accommodate a 30 year life cycle. The project was completed on schedule and on budget.
Complete replacement of original window system. New thermo-pane with heat mirror EFCO double hung window system installed throughout the school and new ceilings.
Killam School was provided with A/E services to replace windows and a new roof in addition. The project was completed under the MSBA Green Repair Program.